Friday, September 22, 2006

Walls framed, running plumbing and electrical

Since Tom came over in March and helped me frame the walls, now I've got lots of plumbing and hundreds of feet of electrical wire to pull.  I'm putting in the flexible conduit for the low voltage outlets so I can upgrade the wires at a future date if required.  We also put a layer of 6mil plastic between the existing concrete walls and the new stud walls.  This will direct any moisture that comes through the concrete down to the plastic drain strip that is at floor level and leads to the sump drain.

IMG_2118

technorati tags:, , , , ,

Blogged with Flock

0 Comments:

Post a Comment

<< Home